Find or Sell any Parts for Your Vehicle in USA

Arias Pistons 12.5:1 Compression 82mm Bore Honda B-series on 2040-parts.com

US $499.99
Location:

Orlando, Florida, United States

Orlando, Florida, United States
Condition:New Brand:Arias Manufacturer Part Number:3330420

Categories
WHY CHOOSE US
Arias Pistons 12.5:1 Compression 82mm bore Honda B-Series
Description

Honda/Acura B18c1 DOHC VTEC 
1.8L 
Stock Bore: 82mm
Stroke: 3.433
Rod: 5.430
Head CC: 41.6
Gasket: .028
Deck: .005
Compression Height: 1.180
Dome CC: 6
Compression Ration with Stock Head: 12.5:1 
Required Ring set: 1012303228



Payment is accepted only through Paypal.

We will only ship to the Paypal confirmed shipping address.

Payment for orders should be made within 5 business days.

Sales tax will be charged for orders from Florida.

If you require another payment arrangement, please contact us by email or eBay seller messages.
You may also like this

BMW Z4 – with 550bhp V10!

Thu, 27 Aug 2009

Manhart Racing has produced a BMW Z4 with the M5 V10 BMW reckons that there is no need for a Z4M, so the best Bavaria offers off the shelf is just over 300bhp. But one man has other ideas – Günther Manhart of Manhart Racing. He decided that what was really needed in the Z4 was that nice V10 from the M5.

SEAT Leon FR 2.0 TDI 184 PS costs from £22,075

Tue, 18 Jun 2013

The SEAT Leon FR 2.0 TDI 184 PS (pictured) arrives in the UK from £22,075 The 2013 SEAT Leon arrived at the Paris Motor Show last year as the Spanish take in the VW Golf. And now the SEAT take on the Golf GTD is in the UK – the SEAT Leon FR 2.0 TDI 184 PS. With a dose of Spanish flair making the SEAT a more flamboyant, and appealing, car than the Golf, it comes with the same 181bhp 2.0 litre diesel as the GTD, offering 0-62mph in 7.5 seconds and 67.3mpg.

GM delays second shift at Volt plant

Fri, 07 Oct 2011

General Motors is delaying the addition of a second shift at its Michigan assembly plant that makes the Chevrolet Volt. In May, GM said that it would add a second shift at its Detroit-Hamtramck plant by late this fall to double Volt production. Instead, a plant overhaul completed this summer, along with a more-modest addition of workers, will allow GM to double production starting early next year while remaining on one shift, the company said Friday.